Barrus projects completes transportation of four reactors

Barrus Projects moved four reactors manufactured by PJSC “Izhorskiye Zavody” from Kolpino, St. Petersburg to Nizhnekamsk, Republic of Tatarstan for the installation of a hydrocracking unit.

The oversized cargo:
· First stage reactor pos. 4104R0101, 53.335 x 7.8 x 6.245 m / 1090.175 T
· Second stage reactor pos. 4104R0102, 33.844 x 7.1 x 5.096 m / 427.38 T
· Hydrodearomatisation reactor pos. 1503R0101 35.9 x 4.5 x 4.16 m / 236.14 T
· Dewaxing reactor pos. 1503R0102 20.7 x 4.5 x 4.06 m / 108.64 T

Barrus Projects had the task of providing services for the transportation of oversized heavy reactors from the manufacturing plant in Kolpino across two railway crossings PCh-10 and PCh-29, including the preparation of the necessary infrastructure for the possibility of passing in curves, transportation by inland waterways using a barge towing arrangement, as well as the delivery of reactors on self-propelled hydraulic modular trailers in Nizhnekamsk.

 

Source: breakbulk.news

Share this article

Want to know more?

Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.