The project
A distribution centre consisting of three warehouses has been built in the port area of Ghent. Soil improvement using gravel columns was carried out for two warehouses with a total floor area of 40,464 m².
•
The challenges
This project was very challenging. It involved a large floor area, a tight schedule and activities by third parties. All this was combined with the logistics and storage of the aggregate material to be used.
•
The solution
By effectively integrating implementation knowledge and experience from surrounding projects into the implementation design during the design phase, Keller devised a highly feasible and cost-effective solution for the client.
The combination of an optimised design and a highly motivated team of employees resulted in a project that was completed on schedule and within budget, and a satisfied client.